Here are some facts, now clarified by the NSW government:
In 18 months what happens to my 60c gross feed in?
On December 31st 2016 when your 60c or 20c contract expires you will simply change to nett metering and use your generation to reduce your bill. This will be a simple change of meter and connection at your meter box.
Nett feed in beside your 60c gross feed in?
The total generation at your home or business can be as high as is needed to replace your grid consumption, while minimising the amount of excess you generate to export to the grid for a pittance. If your existing gross feed in system does not meet this level of generation you can now add a separate nett feed in system to fill the gap without in any way affecting your 60c contract.
You will be pleasantly surprised to find how prices for solar PV have fallen in the last five years, making investment payback so much stronger.
Contact MV Solar to have us look at your situation and help you decide on a winning plan for your Solar PV generation investment.